This project is run by Canal and River Trust.

Project details

Water voles are one of the UK’s fastest-declining native mammals, and canals provide an important connected landscape that can help remaining populations survive, spread, and reconnect. This project focuses on supporting the recovery of water voles in the West Midlands by improving and restoring canal-side habitats at key locations identified as priorities through data analysis and strategic planning.

The project will create safer, species-suitable habitat along canal edges by improving waterside margins, increasing natural vegetation and creating calmer, greener edges to the water. These changes will provide water voles with places to feed, travel, hide from predators, and establish new burrows, helping existing populations expand and become more resilient over time.

The project also has a strong focus on local people and communities. Volunteers will be actively involved in habitat improvement activities and also in monitoring surveys, helping to build skills, raise awareness, and generate long-term stewardship of local waterways. Citizen science style monitoring will provide valuable data to track progress and inform future conservation work.

Overall, the project aims to protect and restore habitats, strengthen water vole populations, enhance canal environments, and inspire local people to care for wildlife close to where they live, contributing to nature recovery across the region.

Scheme / Programme

This project forms part of the Canal & River Trust’s wider Water Vole Recovery Strategy for the West Midlands region, building on previous habitat improvement work delivered through the Green Recovery Challenge Fund. It contributes to a strategic, long-term programme of habitat restoration, monitoring, and community engagement to support water vole populations across the regional canal network.

Scale

The scale of this project is 9,200 metres.

Project delivery timeline

Habitat improvement works will be carried out during the winter period to avoid impacts on other species. Monitoring and volunteer surveys will run alongside delivery and continue post completion to assess outcomes and inform future management.

Community involvement

Local communities and volunteers have helped shape this project through ongoing data collection across the West Midlands canal network. Since 2022, volunteers have taken part in the Vole Patrol citizen science programme, collecting valuable information on water vole presence and habitat condition, which has helped identify priority locations for recovery work.

During delivery, local people will be actively involved through volunteer habitat improvement activities such as planting sessions to enhance feeding areas, alongside continued monitoring surveys to track progress and impact. Post-delivery, volunteers will remain engaged through repeat surveys and stewardship activities, helping assess outcomes, build long-term knowledge, and encouraging community pride in local waterways and wildlife.

Ecosystem services & nature recovery

This project will deliver 16 priority actions in the West Midlands Local Nature Recovery Strategy.

The project will deliver the following environmental, economic, and social benefits:

1 ActionsPriority B. Terrestrial habitats are more joined up to create stronger ecological networks

  • B5 - Reduce barriers to species movement in areas where habitat connectivity is important

1 ActionsPriority C. The ecological functionality of freshwater networks and wetland habitats are maintained and improved at a landscape and catchment scale

  • C4 - Maintain, improve and create naturalised riparian buffer zones along watercourses, including canals

1 ActionsPriority E. The urban environment is improved to become more nature rich

  • E1 - Create stepping stone habitats in areas where corridors cannot be established

7 ActionsPriority F. Species populations are maintained and improved across the region, including suitable species reintroductions

  • F1 - Water vole
  • F2 - Otter
  • F3 - White-clawed crayfish
  • F9 - Urban birds
  • F12 - Amphibians and reptiles
  • F17 - Bats
  • F19 - Pollinators

2 ActionsPriority I. Improved evidence and knowledge to enable scaled-up delivery of nature recovery

  • I1 - Increase coordinated monitoring of the region’s biodiversity
  • I3 - Create a strong evidence base to support and develop nature finance opportunities to drive nature recovery and nature-based solutions forwards.

2 ActionsPriority J. Improved capacity of stakeholders to contribute to nature recovery

  • J2 - Support local people in managing and improving their local environment for nature
  • J3 - Enable communities and environmental Non-Governmental Organisations (eNGOs) to form partnerships with educational institutions, businesses and landowners to deliver nature recovery

Project impact & reporting

The project delivery organisation will provide an annual progress report and a final project report against the following targets:

Habitat

10000m of Standing open water, ponds and canals improved

Coir rolls installed as ‘stepping stones’ for Watervoles – creation of riparian margin


10000m of Modified grassland improved

Diversity planting and enhanced management for grassland condition improvement

Number of species surveys (total of all surveys in project)

3 species surveys

Water vole
Pollinators
Dragon and damselflies

Water quality improvement (e.g. change in chemical/ecological water quality status)

Coir can be used to create a linear soft aquatic bank in front of brick or metal piling edges, however in places coir can also be positioned across the canal edge in a different format. This can provide a more complex aquatic margin habitat and simultaneously trapping sediment and forming a filter barrier against adjacent land use run off, improving water quality. As part of previous projects, we have been trialling innovative installations, for example fitting coir in a zig-zag pattern adjacent to the canal bank, aiming to catch sediment and over time form pockets of habitat with vegetation, providing a more 2-dimensional habitat for water vole rather than simply linear. In addition to this, planting reedbed areas where width/substrate is suitable can create a natural water filtration system lowering phosphorus, nitrogen and biological oxygen demand levels.

How many community engagement events will happen during the project?

20 events

Training for volunteers supporting the practical installation within the project, training for survey participants, and 3 survey activities per year over a 6 year period

How many people will attend community events during the project?

120 people

A conservative estimate of 6 people per event (20 events as above)

How many people will be engaged as volunteers?

18 people

Assumes that once recruited, the same people will continue to be engaged as volunteers. There is also potential for corporate volunteers to participate in survey activities, not included in these numbers.

How many days of volunteering will be achieved?

324 days

18 volunteers participating in each of 18 volunteering dates

WMCA will produce an annual social and environmental impact report detailing the scale of benefits delivered across the region and acknowledging the contributions made by Funding Partners.

Funding

Total funding required:

£120,000

If you are interested in supporting this project, contact us using the button below.